Anyone who commissions a planning or construction project—or oversees it as an architect, landscape architect, or engineer—cannot avoid a set of regulations: the Fee Schedule for Architects and Engineers (HOAI). The HOAI governs how planning services are valued and compensated in Germany. It is not a peripheral bureaucratic issue, but rather the central instrument that defines the economic foundation of freelance planning work, ensures quality standards, and establishes a transparent basis for the relationship between the client and the planner. Anyone who understands the HOAI understands how professional planning works and is evaluated in Germany.
- What the HOAI is, what its legal basis is, and to whom it applies
- Which service descriptions and service phases the HOAI defines for architects and landscape architects
- How fees are calculated under the HOAI: chargeable costs, fee zones, and fee schedules
- What has fundamentally changed as a result of the 2019 ECJ ruling and the 2021 HOAI amendment
- What special provisions apply to landscape architects, open-space planners, and engineers
- How to distinguish between basic services and special services
- What typical errors and misunderstandings arise when applying the HOAI
- How the HOAI fits into the context of public procurement law, contract drafting, and quality assurance
What the HOAI Is: Definition, Legal Basis, and Scope of Application
The Fee Schedule for Architects and Engineers (HOAI) is a federal regulation enacted on the basis of the Architects’ and Engineers’ Services Act (AIG). It specifies how planning services provided by architects, interior designers, landscape architects, and engineers in Germany are compensated. This is not merely a recommendation but binding pricing law that establishes the framework for the remuneration of these services. In practice, the term “HOAI architect” refers to the relationship between the architectural profession and the fee regulations that govern it—that is, the question of how architectural planning services are valued and billed according to the HOAI.
The HOAI applies to services rendered within Germany, regardless of whether the client is a private individual, a company, or a public entity. It covers all natural and legal persons who provide architectural and engineering planning services, including planning firms organized as a GmbH (limited liability company) or a partnership. Services provided abroad, as well as certain services below defined thresholds, are not covered. For clients in the public sector, the rules of public procurement law also apply, in particular the Public Procurement Ordinance (VgV), which requires a formal competitive bidding process for planning services above the EU thresholds.
Historically, the HOAI traces its origins to the Fee Schedule for Architects (GOA), which was developed in the Federal Republic of Germany after World War II to create a uniform and transparent remuneration structure for planning services. Since its introduction, the HOAI has been amended several times, most recently and fundamentally in 2021. The 2021 amendment was a direct response to a 2019 ruling by the European Court of Justice (ECJ), which declared the HOAI’s previously applicable mandatory minimum and maximum rates to be incompatible with European law. This turning point has significantly altered the practical application of the HOAI.
Service Categories and Service Phases: The Structure of the HOAI for Architects
At the heart of the HOAI is the classification of planning services into so-called service categories. A service category describes which professional activities belong to a specific planning area. For architects, the central service category is building design, regulated in Part 3 of the HOAI. In addition, there are service categories for interiors, outdoor facilities, civil engineering structures, transportation facilities, as well as structural engineering and technical equipment. For landscape architects, the “outdoor facilities” service category is particularly relevant, as it encompasses the planning, design, and supervision of the implementation of outdoor facilities, green spaces, parks, and open spaces.
Within each scope of services, the HOAI divides the planning work into nine service phases (LPH 1 through LPH 9). These phases follow the logical sequence of a planning process from the initial concept to the final documentation. An overview of the nine service phases:
- Preliminary Study: Clarification of the project scope, site survey, definition of objectives
- Preliminary Planning: Development of a planning concept, clarification of fundamental solution approaches
- Preliminary Design: Development of the preliminary design as the basis for all further planning
- Permit Planning: Preparation of documentation for official permits
- Construction planning: Drawings and plans for execution by construction companies
- Preparation for Contracting: Quantity takeoff, specifications, cost estimation
- Assistance with the bidding process: Bid evaluation, award recommendation
- Construction supervision: Monitoring of construction work on-site
- Project Support: Documentation, defect monitoring after completion
Each service phase is assigned a percentage of the total fee. The weighting reflects the typical amount of work involved. Service phases 3 (design planning) and 8 (construction supervision) are traditionally the most labor-intensive and thus carry the highest weightings. This structure makes it possible to commission and pay for specific services on a selective basis when the full scope of services is not required. At the same time, the HOAI establishes a standard for what constitutes a complete planning service and protects clients from incomplete service proposals that may appear inexpensive at first glance.
Fee Calculation According to the HOAI: Chargeable Costs, Fee Zone, and Fee Schedule
The calculation of the architect’s HOAI fee follows a three-part system: First, the billable costs of the project are determined; then, the project is assigned to a fee zone; and finally, the fee is taken from the fee schedule or interpolated. This system ensures that the fee reflects both the size of the project and its technical complexity.
The billable costs are not identical to the total construction costs. The HOAI precisely defines which cost groups, in accordance with DIN 276 (Construction Costs), are included in the calculation. For buildings, these are generally the costs of the building structure and technical systems, but do not include land costs, outdoor facilities, or furnishing costs, unless these are designed by the architect. In practice, the exact definition of billable costs is one of the most common points of contention between the client and the designer, because differing interpretations can lead to significant differences in fees.
The fee zone describes the technical complexity of a project. The HOAI distinguishes five fee zones (I through V) for buildings, with Zone I covering simple planning tasks with minimal requirements and Zone V covering particularly challenging projects with a high degree of design, technical, or structural complexity. Classification is based on evaluation criteria listed in the HOAI, including requirements for integration into the surroundings, construction, technical equipment, and design quality. For outdoor facilities, corresponding fee zones with their own evaluation criteria apply, which take into account the specific requirements of outdoor space planning.
Based on the billable costs and the fee zone, the fee schedule establishes a fee range that specifies a minimum and a maximum value. Until the 2021 amendment to the HOAI, these values were established as binding minimum and maximum rates: fees below the minimum rate were generally prohibited, while fees exceeding the maximum rate were permitted only in exceptional cases. Following the ECJ ruling and the 2021 amendment, these values have taken on the character of guidelines from which the parties may deviate by contract. However, the fee schedule remains of central importance as a reference and basis for calculation.
The 2019 ECJ Ruling and the 2021 HOAI Amendment: What Has Changed
In July 2019, the European Court of Justice ruled that the mandatory minimum and maximum rates under the HOAI violate the European Services Directive. The directive prohibits member states from setting binding price ranges for services if these restrict the free movement of services within the single market. Germany had argued that the minimum rates ensured planning quality because they prevented cut-throat competition. The ECJ did not accept this argument and required Germany to amend its legislation.
The amendment to the HOAI, which took effect in 2021, formally abolished the mandatory minimum and maximum rates. The fee schedules remain in place, but their values are now formulated as guidelines. Contractually, clients and planners may deviate from these values, either upward or downward. In practice, this means that architects or landscape architects who offer services for a fee below the previous minimum rates are no longer automatically acting unlawfully. Conversely, clients can no longer automatically assume that an agreed-upon fee below the former minimum rate will be raised to that level retroactively.
This change has significant practical consequences. Planning firms face greater price pressure because clients can now negotiate fees without the protection of a statutory minimum. At the same time, planners no longer have the previous option of retroactively raising a contractually agreed-upon low fee to the minimum rate once the project has been completed. This development must be viewed critically from the perspective of quality assurance in planning: Price competition can lead to a reduction in the scope of services and the depth of work, without this being immediately apparent to the client. Professional associations such as the Federal Chamber of Architects and the Association of German Landscape Architects (BDLA) have repeatedly pointed out these risks.
Despite liberalization, the HOAI remains the authoritative reference document for evaluating planning services in Germany. In fee disputes, courts continue to use the fee schedules as the benchmark for reasonable compensation. Public clients also use the HOAI rates as a basis for cost estimates and award decisions. The fee schedule has thus retained its practical significance, even though its binding nature has been weakened.
Specific Provisions for Landscape Architects and Open Space Planners
For landscape architects and open-space planners, the HOAI is relevant in several service categories. The most important is the “Outdoor Facilities” service category (Part 3, Section 2 of the HOAI), which covers planning services for outdoor facilities, green spaces, parks, sports facilities, playgrounds, and comparable open spaces. In addition, landscape architects may also provide services under the “Landscape Planning” scope of services (Part 2 of the HOAI), which covers landscape planning services as defined by the Federal Nature Conservation Act—that is, landscape plans, green space plans, and environmental reports.
A key difference between the “Buildings” scope of services and the “Outdoor Facilities” scope of services lies in the nature of the billable costs. For outdoor facilities, billable costs are often more difficult to determine because planting work, earthwork, and fixtures are treated differently. Planting costs are generally fully billable, whereas certain fixtures or technical installations are only partially included, depending on the contract and its interpretation. These issues of demarcation require careful contractual clarification at the start of the project.
The fee zones for outdoor spaces differ in substance from those for buildings. Evaluation criteria here include, among other things, integration into the surroundings, ecological and design complexity, requirements for plant selection and vegetation techniques, as well as the intensity and diversity of use of the outdoor space. An inner-city plaza with high design requirements, complex planting, and elaborate drainage systems is assigned to a higher fee zone than a simple lawn with standard planting. While this differentiation makes professional sense, in practice it requires a well-founded justification for the zone classification, which must be verifiable in the event of a dispute.
Basic Services and Special Services: Distinction and Significance
The HOAI distinguishes between basic services and special services within each scope of services. Basic services are those activities that are generally required for the proper fulfillment of the planning task. They are listed in the HOAI for each service phase and form the basis for fee calculation. An architect or landscape architect working on a project in accordance with the HOAI is generally obligated to provide the client with all basic services for the commissioned service phases, unless otherwise agreed upon in the contract.
Special services are activities that go beyond the scope of basic services or meet specific requirements of the individual project. They are not included as a lump sum in the HOAI fee and must be agreed upon and compensated separately. Typical special services in the field of open-space planning include, for example, the preparation of maintenance and development plans for green spaces, the conduct of vegetation surveys, the development of planting concepts with a particular ecological focus, or the facilitation of public participation processes. Services related to environmental impact assessments, impact-compensation assessments, or species protection assessments are also generally considered special services that must be compensated separately from the base fee.
In practice, the distinction between basic services and special services regularly leads to misunderstandings. Clients often assume that certain services they take for granted are included in the base fee, while planners classify them as special services. Careful contractual clarification at the start of the project regarding which services are being commissioned and how they will be compensated is therefore essential. Model contracts provided by professional associations, such as the BDLA or the Federal Chamber of Architects, offer a good foundation for this but do not replace project-specific adjustments.
Common Errors and Misunderstandings in Applying the HOAI
One of the most common mistakes in practice is the incomplete or incorrect determination of billable costs. If cost categories are incorrectly assigned or costs are overlooked, this results in an incorrect fee that either disadvantages the planner or places an excessive financial burden on the client. Particularly in mixed-use projects, where building and open-space planning intersect, the boundaries of billable costs must be carefully defined.
Another common misunderstanding concerns the service phases themselves. Clients sometimes commission only individual service phases without realizing that certain phases build upon one another and that meaningful planning is hardly possible without completing the preceding phases. Anyone who commissions an architect only starting with Service Phase 5 (construction planning) without having fully completed Phases 1 through 4 risks planning gaps and quality defects that will become apparent during the construction and operation of the building or facility.
Finally, the importance of a written contract is often underestimated. While the HOAI sets the framework for fees, the specific scope of services, payment terms, liability provisions, and project organization must be precisely defined in the architect’s or engineer’s contract. A verbally agreed-upon commission or a contract that merely refers to the HOAI without specifying the scope of services is a common source of conflict. The Procurement and Contract Regulations for Services (VOL) and the General Contract Provisions for Architectural and Engineering Services (AVA) provide supplementary regulatory frameworks that should be utilized in practice.
The HOAI in the Context of Quality Assurance and Planning Culture
The HOAI is more than just a price list. It is a quality assurance tool because it defines what constitutes a complete and professional planning service. The service descriptions and service phases outline a planning process based on experience and professional expertise. Those who understand and apply this structure deliver planning services that are transparent, verifiable, and comparable in quality. This protects clients from incomplete services and planners from unjustified additional claims.
For landscape architects and open-space planners, the HOAI holds special significance because it places planning services for outdoor spaces on par with building design, thereby legally establishing the professional equivalence of open-space planning and building design. This is by no means a given: In the public perception and in some client cultures, open-space planning and planting concepts are still regarded as secondary services that justify lower fees. The HOAI counters this with a clear valuation structure.
The debate over the future of the HOAI following the ECJ ruling is not yet over. Professional associations, planning firms, and public clients are discussing how planning quality can be ensured in a liberalized fee market. Competition based on quality rather than price—that is, selecting planners based on professional competence and the quality of their concepts rather than the lowest fee bid—is the goal pursued by both public procurement law and professional associations. The negotiated procedure with a preliminary suitability assessment and quality-oriented selection—as provided for in the Public Procurement Regulation for planning services above the EU thresholds—is an important tool in this regard. In this context, the HOAI remains the indispensable reference system that describes and evaluates planning services and embeds them in an economic framework that does not sacrifice quality to price pressure.