Opens in a new tab

Declaration of Conformity for Fire Protection: Fundamentals, Calculations, and Practice

Anyone who puts a building into service assumes responsibility for more than just its function and aesthetics: they assume responsibility for the lives of the people inside it. The Declaration of Conformity for Fire Protection is the legal and technical instrument through which designers, manufacturers, and construction managers document this responsibility to authorities, building owners, and the public. It confirms that the construction products used and the structures built comply with applicable fire safety requirements, making it far more than just a bureaucratic form: it is the backbone of the chain of evidence in preventive fire protection.

  • What the Declaration of Conformity for Fire Protection Is and What Its Legal Basis Is
  • How it differs from CE marking, general building authority approval, and other forms of documentation
  • Who is required to issue it and during which construction phases it becomes relevant
  • Which construction products and structures require a Declaration of Conformity
  • How the declaration is structured in terms of content and what information it must include
  • What role test certificates, classification reports, and proof of suitability play in this context
  • What typical errors occur in practice and how to avoid them
  • How the Declaration of Conformity is integrated into the overall system of structural fire protection documentation

Definition and Legal Basis: What Is the Declaration of Conformity for Fire Protection?

The Declaration of Conformity for Fire Protection is a written declaration by the manufacturer or the company responsible for the work stating that a construction product or construction method complies with the requirements of a technical regulation, a general building authority approval (abZ), or a general building authority test certificate (abP). It is enshrined in German building code law and derives from the state building codes of the individual federal states, which in turn are based on the Model Building Code (MBO). The Construction Products Act and the European Construction Products Regulation (EU CPR, Regulation No. 305/2011) form the overarching European legal framework within which the national regulations are situated.

The term “conformity” does not refer to a general statement of quality, but rather to a precise technical statement: The product or structure conforms to the requirements specified in a particular set of regulations or approval document. These requirements may pertain to fire behavior, fire resistance duration, smoke tightness, melting points of insulation materials, or specific installation conditions. The Declaration of Conformity for Fire Protection is thus an integral part of the chain of evidence, which extends from planning through product selection to execution and acceptance.

Legally, the declaration is required by most state building codes as a prerequisite for the use of certain regulated construction products. Anyone who installs a construction product without the required Declaration of Conformity is acting in violation of the law and risks significant liability consequences in the event of damage. The declaration does not necessarily have to be submitted to the building permit authority, but it must be provided upon request and retained for a specified period. In practice, construction managers and fire protection specialists require the declarations to be submitted no later than the time of final inspection, but often as early as when the products are delivered to the construction site.

Distinction from Related Certification Formats: CE Mark, abZ, abP, and ZiE

The system of proof of suitability for use for construction products in Germany is complex and is often confused in practice. A clear distinction between the individual instruments is therefore a prerequisite for the correct handling of the Declaration of Conformity for Fire Protection. The CE marking, which is awarded on the basis of the European Construction Products Regulation, certifies a product’s conformity with a harmonized European standard (hEN). It is not a quality mark in the strict sense, nor is it proof of suitability for a specific application; rather, it is a Declaration of Performance (DoP) regarding essential characteristics. For fire protection requirements, this means: The CE mark certifies classification according to European testing standards, but does not indicate whether the product meets the requirements of German building codes in a specific construction project.

The General Building Authority Approval (abZ), issued by the German Institute for Building Technology (DIBt) in Berlin, is a national certificate of suitability for use for construction products and construction types for which there is no harmonized European standard or for which the harmonized standard does not cover all relevant requirements. In addition to a description of the product, it also contains detailed rules for use, installation instructions, and testing requirements. The General Building Inspection Test Certificate (abP) is a simplified certificate of suitability for use for products with a lower risk potential, issued by a recognized testing body. Finally, the case-by-case approval (ZiE) is a project-specific exception for products or types of construction that do not have either an abZ or an abP, and requires a separate review by the competent authority.

The Declaration of Conformity for Fire Protection serves as the link between these supporting documents and the specific construction product on the construction site. It declares that the delivered and installed product is in fact identical to the product on which the approval, test certificate, or standard was based. Without this declaration, the approval remains an abstract document with no connection to the actual construction process. This connection is fundamental and is often underestimated in practice.

Who issues the Declaration of Conformity for Fire Protection and when?

The obligation to issue the Declaration of Conformity for fire protection generally lies with the manufacturer of the construction product. In doing so, the manufacturer declares that its product meets the requirements of the respective proof of suitability for use. This manufacturer’s declaration must be distinguished from the Declaration of Conformity within the meaning of CE marking, even though the two are similar in content. In the case of construction systems—that is, the combination of multiple products into a functional unit such as a fire-rated wall or a pipe enclosure system—the responsibility for the Declaration of Conformity lies with the contractor that manufactures and installs the construction system.

In practice, this means: A manufacturer of fire-rated panels issues a declaration of conformity for its panels. The drywall contractor who assembles these panels into a classified partition wall issues a separate declaration of conformity for the completed construction. Both declarations are separate documents with different subjects of reference. As part of project supervision, the fire protection planner or fire protection specialist verifies whether both declarations are available and whether the information provided therein corresponds to the actual installation.

The timing of issuance is also regulated: The declaration of conformity must be available before the product is used or, at the latest, upon completion of the construction. Although retroactive issuance is formally possible, it is problematic under building code regulations because it can no longer provide information about the actual installation status if the component has already been concealed during installation. Experts therefore recommend systematically recording the declarations as part of the construction site documentation and linking them to delivery notes, batch designations, and installation dates.

Content and Structure: What Must the Fire Protection Declaration of Conformity Contain?

A complete Declaration of Conformity for Fire Protection contains a series of mandatory details derived from the respective state building codes and the requirements of the underlying performance certificates. Essential components include the exact designation of the construction product or construction type, including the type designation, batch or serial number, and manufacturer information. Furthermore, a reference must be made to the regulatory framework, approval, or test certificate on the basis of which conformity is declared. This reference must be unambiguous: The abZ number, the date of the test certificate, or the standard designation must be clearly stated.

In addition, the declaration specifies the specific fire protection properties for which conformity applies. These may include fire resistance classes according to DIN EN 13501, such as REI 90 (load-bearing and compartment-sealing function, 90 minutes of fire resistance) or EI 60 (compartment-sealing, 60 minutes), but also building material classes according to DIN 4102 or European fire behavior classes according to EN 13501-1, such as A1, A2, B, C, D, E, or F. The declaration must also specify the installation conditions under which compliance applies, as many approvals are tied to specific installation details: connection designs, fastening spacings, joint designs, or minimum thicknesses.

Formally, the declaration must be signed by an authorized signatory from the manufacturer or the contracting company, including the date, location, and company name. Some state building codes additionally require the location of use to be specified, i.e., the specific construction project. This requirement is sensible because it ties the declaration to a specific project and facilitates later attribution in the event of damage. In practice, it is recommended to maintain a structured filing system for all declarations of conformity within the construction documentation, organized by trade and component, with cross-references to plans and bills of quantities.

Classification Reports and Test Certificates as a Basis

The content of the declaration of conformity is based on classification reports and test certificates issued by accredited testing laboratories. A classification report in accordance with DIN EN 13501 summarizes the results of fire tests and derives the fire resistance class from them. It is not a public document but rather the property of the manufacturer, who uses it as the basis for their Declaration of Conformity. Inspectors and fire protection engineers may request to see the classification report in order to verify the information contained in the Declaration of Conformity. Any planner or construction manager who accepts declarations of conformity without occasionally reviewing the underlying test documents is relinquishing a significant part of quality assurance.

Common Mistakes in Practice and How to Avoid Them

The most common deficiencies in fire protection declarations of conformity relate to four areas: missing declarations, declarations with incomplete content, declarations for the wrong products, and declarations that do not correspond to the actual installation. Missing declarations usually result from a lack of coordination between the supplier and the contractor: The product is delivered and installed, but the declaration arrives later—or not at all. This can be remedied by a contractual provision that defines the submission of the declaration of conformity as an integral part of the delivery.

Declarations that are incomplete in content often lack a batch designation, a reference to the specific construction project, or a specification of the installation conditions. The absence of installation conditions is particularly critical: A fire damper approved for a specific mounting frame and a specific duct layout loses its classification if it is installed differently. The declaration of conformity that does not specify this deviation is then technically incorrect, even if it appears formally complete.

Declarations for incorrect products arise when a manufacturer issues a model declaration of conformity for a product family without specifying the specific variant that was delivered. Fire protection products often come in numerous variants with different classifications, and a blanket declaration for “all products in the X series” is insufficient under building codes. Finally, discrepancies between the declaration and the actual installation arise when products are replaced at short notice on the construction site without updating the documentation. This scenario is more common in practice than one might assume and requires consistent supplementary documentation.

To avoid these errors, fire protection experts recommend the following measures:

  • Early inclusion of requirements for declarations of conformity in specifications and contracts for work
  • Systematic recording of all fire protection-relevant construction products in a product list with links to certificates of suitability
  • Random spot checks of the declarations by the fire protection planner or construction manager during construction
  • Documentation of product substitutions with corresponding updates to the declarations of conformity
  • Retention of all declarations in the construction documentation for at least the duration of the warranty period, preferably for the entire service life of the building

The Declaration of Conformity within the Overall System of Structural Fire Protection Documentation

A building’s structural fire protection is not ensured by a single document, but rather by a system of interlocking verifications, tests, and declarations. The process begins with the fire protection concept, which is prepared by a qualified fire protection specialist and describes the building’s protection-objective-oriented requirements: protecting human life, limiting the spread of fire, and enabling effective fire-extinguishing measures. The fire protection concept specifies which building components must meet which fire resistance classes, which materials may have which fire behavior classes, and which systems—such as fire compartments, fire doors, or smoke exhaust systems—must be provided.

The Declaration of Conformity for Fire Protection is the instrument that ensures the properties required in the fire protection concept are actually present in the completed construction. It bridges the gap between planning and execution. Without it, the fire protection concept remains a theoretical document that provides no indication of the actual conditions of the completed building. In this sense, the Declaration of Conformity is the construction-side counterpart to the fire protection verification on the design side.

As part of the building inspection, the building authority or a commissioned expert verifies whether the essential fire protection requirements have been met. The submission of the Declarations of Conformity is a central element of the supporting documentation. In buildings classified as Classes 4 and 5 under the Model Building Code—that is, in multi-story residential buildings and special-purpose structures—the completeness of this documentation is generally a prerequisite for occupancy approval. If a declaration is missing for a safety-critical building component, approval may be denied until the required evidence is provided.

The fire safety declaration of conformity is of particular importance for special-purpose buildings: hospitals, schools, places of assembly, high-rise buildings, and industrial structures are subject to specific special-purpose building regulations that go beyond the general requirements of state building codes. Here, the chain of evidence is particularly complex because, in addition to general product requirements, specific system requirements must also be met. A fire-separation system in a hospital must not only be classified on its own, but must also have a valid classification in the specific combination of wall construction, pipe type, and fire-separation product. The Declaration of Conformity must explicitly specify this system combination.

Fire Safety Verification as an Ongoing Task: Operation, Renovation, and Documentation

The relevance of the fire protection declaration of conformity does not end with the completion of a building. In the event of renovations, changes in use, or repair measures that affect fire protection-relevant building components, new declarations of conformity are required for the products and construction types used. A common problem in practice is that, during renovation work, the existing fire protection documentation is either unknown or unavailable, making it impossible to assess the conformity of the new components with the overall system. This problem underscores the importance of complete construction documentation throughout a building’s entire life cycle.

Facility managers and building operators are well advised to permanently archive the declarations of conformity as part of the building documentation and to use them as a reference document during renovation projects. In digital building models (Building Information Modeling, BIM), declarations of conformity can be stored as attributes of individual building components and automatically flagged as requiring review when changes are made. This capability is still underutilized in practice, even though it would significantly simplify quality assurance in fire protection.

The fire safety declaration of conformity marks the end of a chain of decisions that begins with planning and ends with construction. It is the document that closes this chain and verifies that the path from requirement to reality has indeed been completed. Those who understand, use, and consistently require this tool not only contribute to the legal safeguarding of the construction project but also to the safety of the people who will use the building. That is the true standard by which every fire safety verification document should be measured.

Also interesting
Hercules’ tuff needs care
a-screenshot-of-a-video-game-lvYN0zvgBoc
Simulated urban development: testing the future before it happens
Part 2 of Operation Night Watch: First, the painting is removed from its wooden frame
Part 2 of “Operation Night Watch” launched!
A professional planning scene in an open space on the topic of Hoai Anlage 11
Hoai Appendix 11: Meaning and Application Explained Simply
Podcast tip: ULI Germany x Alexander Otto
Marble paper: Hunter Bliss produces an eco-friendly alternative to conventional paper. Photo: Pebble Printing Group
Stone paper made from crushed marble
aerial-view-of-city-buildings-tagsuber-MV5b1aJQQys
AI-controlled access logistics in megastructures
In 2000: EXPO visitors look down from the steps onto the square at the eastern end of Dieter Kienast's Avenue of United Trees.
Icons of the 90s: the G+L in January 2022
Banksy on all walls
Extended: Ideas competition – The Post-Corona City

Largest stadium in the world: architecture meets gigantism

Bigger, higher, more expensive: when architecture meets gigantism, no stone is left unturned. The world’s largest stadium has long been more than just an arena – it is a global symbol of power, prestige and technological hubris. But how much innovation is there really in the XXL building? What do we learn from the records, and what remains just an inflated façade? If you like superlatives, you should take a closer look: After all, gigantism not only brings opportunities, but also plenty of risks for architecture, the cityscape and the environment.

  • Analyzing the status quo: Where do Germany, Austria and Switzerland stand in international stadium construction?
  • Innovations and trends: from digital construction processes to sustainable material concepts
  • The role of digitalization and artificial intelligence in gigantic stadium construction
  • Sustainability in XXL format: challenges and solutions
  • Technical know-how: What professionals need to know about the construction, operation and management of mega stadiums
  • Effects on architecture: between iconography, identity and urban planning responsibility
  • Criticism and visions: The pros and cons of architectural gigantism
  • Global perspectives: How do the DACH countries position themselves in the international discourse?

Putting gigantism to the test: status quo and global standards

Building the largest stadium in the world – what sounds like Olympic megalomania has long since become a reality in many countries. In South Korea, India, China and the USA, metropolitan areas are vying for the superlative. The Rungrado May 1 Stadium in Pyongyang holds the record with an official capacity of 114,000, followed by Ahmedabad, Melbourne and other mammoth arenas. In Germany, Austria and Switzerland, on the other hand, the stadiums remain comparatively down-to-earth: The Allianz Arena, Berlin’s Olympic Stadium and the Wankdorf in Bern are in a different league. Here, clever densification dominates over sheer size, and not without reason. The DACH countries focus on multifunctional use, flexible spatial concepts and integration into the urban fabric, which is certainly attracting international attention.

However, international gigantism is also having an impact on German-speaking countries. Investors, event organizers and cities are looking enviously overseas, where mega-events are raking in billions. The temptation to realize XXL projects here in Germany is growing. The pressure is increasing, for example in the wake of Olympic bids or major soccer events. However, scepticism is high: subsequent use is often precarious, operating costs explode and the ecological footprint threatens to pulverize all climate targets. The political debate fluctuates between a desire to invest and a refusal to build, between pride in iconic architecture and fear of the next white elephant.

International developments show that Gigantism is neither a purely architectural nor a purely economic phenomenon. It is always also a political statement, a symbol of progress or arrogance. The role models from India or Qatar stand for a new, global dimension of architecture – often paired with digital tools that have long since become indispensable in planning and operation. Nevertheless, the key question remains: how much stadium can the city tolerate, how much gigantism can society tolerate?

In Germany, Austria and Switzerland, the signs are currently pointing towards densification, conversion and sustainable growth. New stadium projects are being eyed critically, torpedoed by citizens’ initiatives and subject to strict conditions by local authorities. The mistakes of the past – empty arenas, ruinous follow-up costs – run deep. But the temptation to go for superlatives again at the next major event is omnipresent. If you are not careful, you risk losing touch with the global competition – or your own identity.

Conclusion: Gigantism in stadium construction is a hot potato in Central Europe. Between international records, local interests and global challenges, it is important to set the right standards. Those who only build for size quickly overlook what really matters: relevance, sustainability and urban planning intelligence.

Innovation in XXL format: digital processes, smart materials and artificial intelligence

Today, the architecture of mega-stadiums is characterized by a dynamic of innovation that is second to none. Digital planning tools, BIM-based processes and AI-supported simulations are no longer an optional extra, but a must. Parametric models that run through hundreds of thousands of variants, from roof geometry to visitor routing, are already being used in the design phase. Construction processes are digitally controlled down to the last detail and material flows are tracked in real time. A construction site on the scale of a Rungrado stadium is simply unimaginable without digital twins, drone monitoring and automated logistics.

But the innovations go far beyond planning. In operation, mega arenas rely on sensor technology, big data and machine learning. Intelligent systems control climate, lighting and security, analyze visitor flows and optimize queues. Sustainability aspects are monitored in real time: How much energy does the arena consume today compared to the last match day? Where are hotspots occurring and where can adjustments be made? AI algorithms help to reduce resource consumption, increase the quality of the experience and avoid expensive planning errors.

Material innovations also play a central role. High-performance concretes, translucent membranes, recyclable façades – the building materials industry’s arsenal grows with every new superlative. The challenge: materials not only have to look spectacular, they also have to withstand extreme loads. Roof constructions with spans of several hundred meters require new statics, robotic manufacturing processes and digital testing processes. The limits of what is feasible are tested anew with every major project.

Another field of innovation is the integration of digital worlds of experience. From personalized tickets to augmented reality in the seats: mega stadiums are becoming data platforms, hybrid experience spaces that merge sport, events and entertainment. The architecture has to keep up – and often does. Flexible grandstands, modular stages and adaptive infrastructures are not a dream of the future, but the standard in global competition. Those who do not invest here will lose out, even in the battle for major international events.

The pressure to innovate is enormous, but the risk increases with every new record. Technical complexity, a lack of redundancy and dependence on software providers harbor new dangers. The bigger the stadium, the greater the potential problems. If you want to have a say as a professional, you not only need architectural flair, but also digital and engineering skills at the highest level.

Sustainability put to the test: how green can gigantism be?

Gigantic stadiums and sustainability – it sounds like a bad joke at first. The consumption of resources is enormous, the carbon footprint is spectacular and the subsequent use often remains an unsolved problem. Nevertheless, there are approaches that also work in XXL format. Certification systems such as LEED or DGNB are now even being used for mega arenas. Green roofs, photovoltaic systems, rainwater management and energy-saving building technology are standard, at least on paper. The real trick is to integrate the measures into ongoing operations – and to ensure that the arena not only shines in its opening year, but also continues to make sense decades later.

Flexibility remains a key problem. Many mega stadiums are too large to be used to capacity on a permanent basis. Vacancies, high operating costs and an ecological rucksack that never pays for itself are the result. The solution? Multifunctional use, temporary modules, demountability and sharing concepts. Smart architecture takes deconstruction into account and relies on temporary grandstands, convertible roof systems and adaptive infrastructures. In this way, even an XXL building can survive in everyday urban life – and does not necessarily have to degenerate into a monument to megalomania.

Digitalization also plays a decisive role here. Digital twins help to optimize operations, shorten maintenance intervals and deploy resources in a targeted manner. Real-time data makes sustainability measurable and controllable. However, without political control and social pressure, many approaches remain lip service. The major stadium projects of recent decades show this: Only where sustainability is an integral part of planning from the outset can truly sustainable arenas be created.

In Germany, Austria and Switzerland, awareness of sustainability is high, but so are the hurdles. Approval procedures are lengthy, public participation is mandatory and the media are just waiting for the next scandal. As a result, projects are becoming smaller, more agile and more sustainable – at least in theory. There is no big success, but the quality is increasing. In an international comparison, the DACH countries are pioneers in energy efficiency, material innovation and citizen participation. The image as “green builders” has long since become a location factor.

The question remains: how much sustainability can gigantism tolerate? The answer is uncomfortable. As much as necessary, as little as possible – that seems to be the motto of many investors. If you really want to build for the future, you have to move away from pure superlatives and use the XXL building as a laboratory for new sustainability standards. The largest stadium in the world can also be the most sustainable – if the will is there.

Between icon, cityscape and responsibility: the role of the mega stadium in architecture

The mega stadium is more than just a place for sport and spectacle. It is an icon, an urban statement and a symbol of power, identity and community. But with size comes responsibility. Architects must not only deliver a functioning building, but also create an urban narrative that endures. The question of how a stadium fits into the cityscape is more important today than ever before. Integrative concepts that see the stadium as part of a neighborhood are becoming increasingly important. The arena is becoming a public space, a meeting place, a motor for urban development.

At the same time, mega stadiums are projection surfaces for social debates. Who owns the public space? Who benefits from the construction, who is left out? Criticism of gigantism is growing, and not just for ecological reasons. Investors, operators and architects must engage in dialogue – and recognize that size alone is no legitimation. Citizen participation, social integration and cultural diversity are key requirements for any large-scale project today. Those who ignore this risk resistance from the public and failure due to their own hubris.

The global architecture scene discusses the value of gigantism controversially. For some, mega stadiums are beacons of innovation, for others they are relics of an outdated belief in progress. As always, the truth lies somewhere in between. If planned correctly, mega stadiums can be engines for urban development and architectural excellence. Planned incorrectly, they become monuments to waste. The challenge is to understand size as a means to an end – not as an end in itself.

In Germany, Austria and Switzerland, there is a traditional skepticism towards gigantism. The lessons of the past – from the Munich Olympic Hall to the Berlin Olympic Stadium – still shape the debate today. Nevertheless, there is a growing willingness to break new ground. Flexible utilization concepts, participatory planning processes and greater integration into urban infrastructures are now standard. The mega stadium is becoming a multifunctional hub, not just a sports arena. Architecture must respond to this and find new answers.

In the end, the question of responsibility remains. Anyone who builds a mega stadium not only shapes the cityscape, but also shapes society. Size is an obligation – to innovation, sustainability and social participation. Architecture can live up to this claim if it sees gigantism not as a dogma, but as an opportunity.

Criticism, controversy and visions: What remains of architectural gigantism?

Gigantism in stadium construction is a double-edged sword. On the one hand, there is innovation, prestige and economic potential. On the other hand, there is criticism of the waste of resources, social exclusion and urban monotony. The debate is as old as stadium construction itself – and yet more topical than ever. At a time when sustainability, digitalization and social justice are setting new standards, XXL construction is being put to the test. Anyone planning a mega stadium today has to offer more than just superlatives. They must provide answers to the pressing questions of our time.

The criticism of gigantism is manifold. Too big, too expensive, not sustainable enough – these are the common accusations. The term “white elephant” has become synonymous with failed XXL projects. But there are also counter-examples: Stadiums that act as a driving force for urban development, promote social integration and set new standards in terms of sustainability. The truth is: size is not a flaw as long as it is used intelligently. Architectural gigantism can produce innovations that advance the entire construction sector – or it can become a memorial to the mistakes of the past.

The visions for the future are ambivalent. Digital technologies and AI are opening up new opportunities to optimize operations, increase sustainability and revolutionize the user experience. At the same time, there is a growing danger that mega stadiums will degenerate into isolated worlds of experience that have little to do with the city and its inhabitants. The challenge is to understand the stadium as part of an urban ecosystem – networked, flexible, sustainable and open to all.

The DACH countries are sought-after discussion partners in the global discourse. Their experience with sustainable construction, participatory planning and technical innovation is in demand. However, international gigantism has long since become the benchmark. If you want to play in the concert of the big players, you have to be prepared to break new ground – without betraying your own values. Architecture is faced with the task of taming gigantism, rethinking it and giving it a contemporary, sustainable form.

So what remains of architectural gigantism? The realization that size alone is not enough. It takes intelligence, responsibility and vision to turn the world’s largest stadium into more than just an arena. It takes courage for innovation, participation and sustainability. The future of stadium construction will not be decided by the height of the stands, but by the depth of thinking.

Conclusion: mega stadiums are touchstones for the architecture of the future. They are laboratories for innovation, a stage for social debate and a memorial to the mistakes of the past. Gigantism is not an end in itself, but a challenge. Those who accept it can set new standards – for technology, sustainability and urban quality. But size is an obligation: responsibility, foresight and genuine relevance. Everything else is just a façade.

Corona and architecture: study on the economic situation

What economic impact has the coronavirus pandemic had on architecture? A new study reports on the year 2020.

A new study reports on the economic situation of engineers and architects for the 2020 financial year. Of particular interest: What economic impact did the coronavirus pandemic have on architecture? You can read an overview of the results here.

For over ten years, the AHO, together with the Federal Chamber of Engineers and the Association of Consulting Engineers, has been monitoring the economic situation of German architecture and engineering firms. The results of the studies for the 2020 financial year were recently published.

A total of 653 offices, predominantly from the engineering and architecture sector, took part in the current survey. Just over 18 percent, i.e. 118 of the offices surveyed, are classified as architecture firms. Accordingly, they generate more than 50 percent of their turnover in the specialist field of “architecture”. Most of them, namely over 70 percent, are staffed with up to ten employees. In the survey, 28 percent of architecture firms are made up of individuals.

The results clearly show that Corona has not reduced the need for personnel in architecture since the previous study, in fact the opposite is the case: architects as well as technical and other employees are still desperately sought after in architecture. Only 2.3 percent of architecture firms see a lower demand for permanently employed architects in 2022. In contrast, 47.7 percent see a greater need for them in the coming year than today. The picture is similarly dramatic for technical staff, with 37.5 percent of architecture firms planning to expand their workforce. Only 5 percent see a lower need here next year.

The order books of architecture firms are correspondingly full, even during coronavirus. The average order backlog is 10.5 months. At the same time, 23.6% state that they are still working to capacity for more than twelve months. For 14.5 percent, the orders will last for a maximum of three months. On average, one person working in architecture firms generated a turnover of 80,626 euros with simultaneous costs of 64,262 euros. More than 90 percent of all offices surveyed generated a profit in 2020.

You can download the entire evaluation of the survey on the economic situation of engineers and architects in 2020 from the AHO website.

Even if coronavirus only had a minor impact on the economic situation of many architecture firms, the pandemic has significantly changed the everyday lives of planners. For two years now, the everyday life of budding planners in particular has been digital and from home. In September, we spoke to the Federal Landscape Student Council about studying in times of coronavirus.