In the heart of Kassel, at Kölnische Strasse 4, stands a building that, following extensive modernization, impresses not only with its functionality but also with its aesthetic presence. The GWH high-rise, originally built in 1969, has undergone a fundamental transformation under the leadership of the architectural firm Dietz Joppien Hammerschmidt (DJH).
The most striking change can be seen in the redesigned front of the building. A three-dimensional metal façade, made of powder-coated, perforated panels, lends the high-rise a sculptural quality;the structure of this façade creates a play of light and shadow that varies depending on the time of day and lends the building a lively dynamic. The perforations were precisely defined using parametric planning and allow light to enter the rooms behind despite the closed surface.
In addition to the aesthetic enhancement, the measures focused on energy-efficient refurbishment. A photovoltaic system integrated into the south façade covers around a third of the building’s own electricity requirements, whilea heat pump was also installed on the roof to contribute to efficient heating and cooling. These measures underline the efforts to bring the high-rise building up to date not only visually, but also functionally.
The high-rise building serves as the headquarters of GWH in northern Hesse and, in addition to the office space, also houses a two-storey extension that will be used by a service company in future. The modernization was carried out during ongoing operations, which presented a logistical challenge, but was successfully mastered.
Read also: The art space at the University of Kassel by Innauer Matt.